Panel & Service Upgrades
A 1958 South Hill house on a 100A service with a Zinsco load center is the single most common call we get. We replace the panel, the meter base, the mast and weatherhead, and the grounding electrode system as one job — because Avista won't re-energize a half-measure.
- Scope200A load center, meter socket, main disconnect, SER conductors, new ground rods plus Ufer where accessible, intersystem bonding termination, AFCI/GFCI breakers per current code, hand-lettered circuit directory.
- Brands we pull outFederal Pacific Stab-Lok, Zinsco, Challenger, and any 60A fuse panel still wearing a screw-in Edison base.
- UtilityMeter pull and reconnect coordinated with Avista under the April 2024 Electric Service Requirements — one point of delivery, one approved socket, inspection before energizing.
- PermitCity of Spokane addresses: we pull it on our Online Permit System account and call the named inspector before 8:30 a.m. Unincorporated county: L&I, 901 N. Monroe St., Suite 100.
- Time on site6–8 hours for a straight swap. Power off roughly 4 of those. Overhead-to-underground conversions run two days.
- Included freeType 2 whole-home surge protective device with every 200A replacement.